Persian Gulf Bidbolnd Gas Refining Co.

بیدبلند (1)
سیستم zld
  • Subjrct: Industrial Wastewater Reuse-ZLD
  • Capacity: 540m3/day
  • source: RO reject, Boiler and Cooling tower blowdown
  • Target: Ziro Liquied Discharge
  • Location: Behbahan

Selected photos

About project

The subject of the contract includes the design, purchase, transportation and operation of the sewage treatment package for the project of non-industrial buildings of the Beed Beland Gas Refinery without odor, including the odor control and removal system and the dewatering package from the sewage treatment sludge using filter press along with spare parts. It is two years old and training.

Video