Capacity 7.780 m³/day 7.780 m³/day source of Wastewater Municipal Waste Water (Ardakan) Well water(Mileshbar well ) Treatment Method RO Target Industrial water production
Subject: Waste Water Reuse & Water Treatment Source of Waste Water: Municipal Waste Water(Zarand) Capacity: Uf Unit:33600 m³/day RO Unit 1 :24000 m³/day RO Unit 2 :3960 m³/day Target: Industrial Water production Uf Unit :(Turbidity <.5 NTU) RO Unit 1 :(TDS<150 ppm) RO Unit 2 :(TDS<10 ppm)
Capacity: 4,800m m³/day Type: Surface Water Source: Bahman-Shir River Application: Boiler: 1920 m³/day Cooling Tower: 840 m³/day Potable Water: 100 m³/day
Capacities: Phase 1: 5000 m³/day Phase 2: 5000 m³/day Source: Phase1: Well Water (TDS 1100 ppm) Phase 2: Concentrated Water From RO 1 (TDS 7000 ppm) Treatment Method: Reverse Osmosis
Subject: Utility and Offsite Carry out & designing, purchase, installation, pre-commissioning and commissioning of all offsets and utilities of the domestic projects of the refining company of isfahan (SSU Sulfur Unit, Refinery, Zero Blow Down & loading platform) & connecting the products of these units and pumping out the waste water from the refinery to […]
Subject: Wastewater Reuse Source of wastewater: Oily Wastewater & Municipal Wastewater Target:industrial water production Capacity: Pretreatment System: 72000 m3/day
Capacity: 36,000 m3/day Subject: Wastewater Reuse Wastewater Transferring Line( 15 km) Source of wastewater: Municipal Wastewater Treatment Method: Activated Sludge, UF & RO Target: Industrial water production
Subject: Wastewater Reuse Source of wastewater: Municipal Wastewater(shahin-shahr) Target: industrial water production Capacity: 21600 m3/day (900 m3/hr)
Subject: Wastewater Esfahans Oil Refinery Co. Source : Industrial ww cooling tower blowdown treated Oily wastewater Project: Design, Supply, Construction, Installation, Pre-Commissioning and Commissioning of pretreatment system for Reverse Osmosis Capacity: 10800 m3/day